Job Card for 1 & 2-Family Dwellings
The following example will show you some of the many items that are found on a typical job card.
You can check out the categories for the interactive guide sheet regulations and comments on each item.
One and Two-Family Dwellings Inspections on Record Califiornia Residential Building & Building Code/
|
|||||||||
Address: _____________________________________________ Suite:_________ APN:______________________ _____________________________________________ Description:_________________________________________________________________________________________ Owner: _________________________________________ Issued:___________________________ Contractor:______________________________________ Type:_________________ Construction:____________________________________ Sprinklers: Yes____ No _____ Permits: ________________________________________ Spec Insp: ______________________________________ |
|||||||||
GENERAL NOTES (These items [1a–5b] are specific to the City of Oakland, but are included as examples) | |||||||||
1a.
|
This Inspection Record Card, Approved Plans, and Approved Constrcution Management Plan must be readily available at the jobsite for all inspections. Protect all documents from the weather. | ||||||||
1b.
|
All construction must remain readily visable for inspection until the “OK TO COVER“ boxes on this Inspection Record Card have been signed and dated by the City Inspector. | ||||||||
1c.
|
Noise levels and Hours of Construction shall conform with the Zoning Conditions of Approval and Oakland Municipal Code regulations. | ||||||||
1d.
|
Follow all hazardous material testing, worker protection, remediation, and disposal regulations (lead-based paint, asbestos, etc.). | ||||||||
1e.
|
Toilet facilities must be provided on-site for construction workers. | ||||||||
Permit Expiration & Refund | |||||||||
2a.
|
A permit may be extended (fee required) for a total of one year from the date of issuance only if no inspections have been performed. | ||||||||
2b.
|
Each permit will expire separately unless each of the Major Inspections (Subsurface, Substructure, Surface, Superstructure) is approved by the City Inspector every 6 months (or sooner). An expired permit cannot be reinstated if an inspection has been performed. | ||||||||
2c.
|
A Refund Request must be filed for all refunds. Up to 80% of inspection fees may be refunded if no inspections have been performed. No fees may be refunded more than 180 days after a permit has expired. | ||||||||
Site Maintenance | |||||||||
3a.
|
“Best Management Practices” must be used daily for dust control and to protect storm water drainage systems (C6). | ||||||||
3b.
|
Jobsite must be cleaned daily of trash and debris and maintained free of graffiti. Construction materials must be neatly stockpiled on-site. Vehicles and equipment must be parked on-site (see 5a below). | ||||||||
Inspections | |||||||||
4a.
|
To avoid being charged for an inspection, a cancellation must be called-in before 10:00 am on the morning of the scheduled inspection. | ||||||||
4b.
|
For Building (PZB), Electrical (PZE), Plumbing (PZP), Grading (GR), and Infrastructure (PX, PZ) inspections, call (510) 238-3444 weekdays 8:00 am to 4:00 pm, Wednesdays 9:30 am to 4:00 pm well in advance. Each permit must be scheduled separately. | ||||||||
4c.
|
For Public Works inspections (PY, SL, CGS,X), call (510) 238-3651. For EBMUD inspections, call (510) XXX-XXXX . | ||||||||
4d.
|
When a permit is Greenpoint or LEED energy rated, third-party inspections by a pre-Certified Rater must be also be completed. City inspections are not a substitute for the Certified Rater’s inspections and approvals. | ||||||||
Additional Permits | |||||||||
5a.
|
Separate permits (OB) are required to reserve curbside parking or to obstruct the sidewalk or street in any way (scaffolding, pedestrian canopy, construction fencing, material stockpiles, debris dumpsters, traffic lane closure, etc.). | ||||||||
5b.
|
Separate Fire Prevention Bureau permits and inspections are required for fire waterline and hydrants. | ||||||||
5c.
|
Separate permits (X, SL, CGS) are required for excavation and repair work in the Public Right-of-Way (sidewalk, curb, gutter, driveway approach, sewer lateral, water and gas piping, storm drain, etc.). | ||||||||
1
|
FOUNDATION
Major Inspection |
2
|
1st FLOOR Major Inspection
|
3
|
FRAME
Major Inspection |
4
|
FINAL
Major Inspection |
5
|
SITE
|
1
|
ELECTRICAL
|
2
|
ELECTRICAL
|
3
|
ELECTRICAL
|
4
|
ELECTRICAL
|
5
|
PRE-CONSTRUCTION
|
CONSTRUCTION POWER | UNDERFLOOR | SUBPANEL / FEEDER | UTILITY RELEASE | CONSTRUCT MNGT PLAN | |||||
UFER | INTERIOR / EXT WIRING | ENERGY CODE | OBSTRUCT / ENCROACH | ||||||
UNDERGROUND | BOX MAKE-UP | CALGREEN | SURVEY / ELEVATION | ||||||
SMOKE & CO ALARMS | GRADING | ||||||||
RE 38
|
FRAME O.K. |
RE 86
|
FINAL ELECTRICAL | CREEK PROTECTION | |||||
1
|
PLUMBING
|
2
|
PLUMBING
|
3
|
PLUMBING
|
4
|
PLUMBING
|
TREE PROTECTION | |
UNDERGROUND | UNDERFLOOR DUCTS | DWV PIPING | WATER SERVICE | VEGETATION CLEARING & GRUBBING | |||||
BACKWATER VALVE | GAS PIPING | GAS TEST | DUST & EROSION CONTROL | ||||||
WATER PIPING | UTILITY RELEASE | C6 & RAINWATER RUNOFF | |||||||
TUB / SHOWER PAN | ENERGY / FORMS / CALGREEN | EXCAVATION SHORING | |||||||
ANTI-SIPHON VALVE | CHLORINATION / SI REPORTS |
TRAFFIC CONTROL & PARKING | |||||||
FINAL PLUMBING | BLIGHT / NOISE / TOILET | ||||||||
1
|
MECHANICAL
|
2
|
MECHANICAL
|
3
|
MECHANICAL
|
4
|
MECHANICAL
|
4 |
INFRASTRUCTURE |
UNDERGROUND | UNDERFLOOR DUCTS | FLUE | EQUIPMENT | SEWER / BACKWATER | |||||
RADIANT/ COILS | RADIANT / COILS | RADIANT / COILS | ENERGY FORMS / CALGREEN | STORM DRAIN | |||||
|
DUCT (LOW PRESSURE) | DRAINAGE | |||||||
MANUF FIREPLACE | HARDSCAPE | ||||||||
COMBUSTION AIR | SHARED DRIVEWAY | ||||||||
EXHAUST DUCTS | C3 FACILITY | ||||||||
FRAME O.K. | FINAL MECHANICAL |
PZ 86
|
FINAL INFRASTRUCTURE | ||||||
1
|
BUILDING
|
2
|
BUILDING
|
3
|
BUILDING
|
4
|
BUILDING
|
7 |
GRADING |
SURVEY / STAKING | FLOOR ELEVATION | ROOF FRAMING & NAILING | DECK / RETAIN WALL |
PRECONSTRUCTION | |||||
SETBACK | PRE-FRAME ROOF HEIGHT | ZONING ROUGH | ZONING CONDITIONS | PAD | |||||
SP INSPECT REPORT | SP INSPECT REPORT | SP INSPECT REPORT | SP INSPECT REPORT | SP INSPECT REPORT | |||||
PIERS | FLOOR FRAMING | FIRE RATED ASSEMBLY | ENERGY CF-6R | FINAL GRADING | |||||
FOOTING / GRADE BEAM | INSULATION | SOUND ASSEMBLY | CAL GREEN |
8
|
RIGHT OF WAY
|
||||
EMBEDMENTS | SHEAR INTERIOR | GPR COMPLIANCE | SIDEWALK / DRIVEWAY | ||||||
SLAB FLOOR / VAPOR BARRIER | SHEAR EXTERIOR | SMOKE & COALARMS | EBMUD LATERAL CERTIFICATION | ||||||
WP PROTECTION& DRAINAGE | FLOOR & WALL FRAMING | RECYCLING CDSR | FINAL ROW | ||||||
MASONRY WALLS | INSULATION |
6
|
FIRE MARSHALL
|
||||||
LATH | FIRE SPRINKLER | ||||||||
WP MEMBRANE | FINAL FIRE (510) 238-3851 | ||||||||
EGRESS WINDOWS SAFETY GLAZING |
7
|
PLANNING
|
|||||||
OK TO COVER |
RB48
|
OK TO OCCUPY |
ZC58 |
ROUGH | |||||
TUB / SHOWER WALL | LANDSCAPE / HARDSCAPE | ||||||||
GYPSUM WALLBOARD | SITE IMPROVEMENTS | ||||||||
FIRE SAFING |
RB86 |
FINAL BLDG | FINAL ZONING | ||||||
186 |
FOUNDATION |
286 |
FIRST FLOOR APPROVED
|
386 |
FRAME |
498 |
RESIDENCE FINAL |
999 |
PROJECT FINAL
|